← All tools
Free tool

OEE calculator

Enter one machine's or line's figures for a shift. The tool calculates OEE (overall equipment effectiveness) with its three components and shows where most of the loss comes from.

One shift or one day

minutes
Shift time minus breaks and planned maintenance.
minutes
Breakdowns, setups, mould changes, waiting for materials or an operator.
seconds/unit
The time it takes the machine to produce one part when nothing goes wrong.
units
Including defective parts.
units

Result

OEE
–
Lost output
–
Availability–
Performance–
Quality–

Time lost to downtime–
Time lost to slow running–
Time spent on defective parts–
Extra good parts at 85% OEE–

The calculation is done in your browser; your figures go nowhere unless you send them.

What does this result mean for you?

Send us your figures and the result; we'll review them and get back to you within one business day. Free and non-binding.

How is it calculated?

Calculating OEE once is the easy part. The benefit comes when it's measured every day for every machine and downtime is recorded with its causes. Downtime written on paper or in Excel at the end of the day is both incomplete and late. When the operator picks the stoppage on a tablet as it happens, you can see straight away how many hours a month each breakdown, each mould or each wait for materials costs you. More on this in the production management software article.

Frequently asked questions

What is a good OEE?

Around 85% is considered world class. In companies that have just started measuring, 40–60% is common. What matters more than the figure itself is which of the three components the loss is concentrated in, and how it changes from week to week.

Where do I find the ideal cycle time?

The time it takes the machine or mould to produce one part when nothing goes wrong. Use the value in the machine's specifications or the best sustained speed you've seen. If performance comes out above 100%, the cycle time you entered is too long.

Are breaks included in planned time?

No. Subtract from the shift time anything you already know won't be worked, such as lunch, tea breaks and planned maintenance. Breakdowns, setups, mould changes and waiting for materials are entered as downtime.

Are the numbers I enter sent anywhere?

Not unless you send them. The calculation is done entirely in your browser and nothing is saved. Your figures reach us only if you fill in and send the “Evaluate my result” form, so that we can get back to you.

Let's measure your downtime every day

Let's set up a system where output, downtime causes and defects per machine are entered on the shop floor as they happen, and OEE comes out on its own.

Let's talk

Free digitalization report

Tell us about your business in a few steps, and we'll email you a report on which software you need for which part of your work and where to start.

Request my report